DOHA15:00
  • 15:10Chillers at peak load across West Bay
  • 18:05Façade lighting on schedule, 214 circuits
  • 19:30Night security shift on post, 38 guards
  • 22:10Cleaning crews on floors 12 to 30

Integrated facilities management · Qatar

Doha neverswitches off.Neither do we.

Hard services, soft services and one 24/7 helpdesk for the towers, compounds, hotels and campuses that keep Qatar running.

Scroll

What we do

We run the plant rooms, risers and car parks nobody thinks about. So the people upstairs never have to.

Hard FMMEP, HVAC, power, water, fire & life safety, BMS
Soft FMCleaning, security, landscaping, pest control, waste
One contractOne helpdesk number, one monthly KPI report
L 6 240 mm H 2 450 mm AHU / CH-02 · ROOF L32 PPM DUE 03 DEC · 500 TR
Asset CH-02 · tagged, logged, on the PPM calendar

One tower, X-rayed

Every system.
One team.

  1. 01
    HVAC & chillers

    Chillers, AHUs, FCUs and ducts serviced on a PPM calendar, before the July peak, not during it.

  2. 02
    Power

    Substations, generators, risers and every DB board, thermal-scanned and load-tested.

  3. 03
    Water & drainage

    Tanks cleaned and disinfected, pumps balanced, leaks found before the ceiling does.

  4. 04
    Fire & life safety

    Sprinklers, alarms and fire pumps tested and kept to Civil Defence standard.

  5. 05
    Lifts & BMS

    Lifts tracked, sensors watched from our control room, alarms answered in minutes.

  6. 06
    Soft services

    Cleaning, security patrols, landscaping and waste, on the same contract and the same app.

Assets tagged0
0Helpdesk, every day of the year
0Emergency on-site target
0Own technicians & crew
0PPM on schedule target

One call.One team.

No chain of subcontractors. Our own technicians, our own vans, our own stores of spare parts in Doha. When you call at 2 a.m., the person who answers can send someone.

  • Multi-skilled MEP technicians on every shift
  • Stocked service vans zoned across Doha, Lusail and Al Wakrah
  • Photo report on every closed job
QAYIM technician on site

24/7 helpdesk

Something broke? Here's what happens next.

Pick a problem. Every ticket gets a priority, a technician and a clock the moment it lands.

WO-48213 P2 · Urgent

AC not cooling

Tower B · Floor 14 · Unit 1404MEP · HVAC team
    Send this to the helpdesk on WhatsApp

    Times shown are our target response for this priority.

    Services

    Everything a building needs, on one contract.

    Sectors

    Built for buildings that can't close.

    Taking over a building

    From keys to day one in 30 days.

    Day01
    1. Day 01

      Site survey

      We walk every plant room, riser and roof with your team and photograph the condition of every major asset.

    2. Day 07

      Asset register & PPM plan

      Each asset is QR-tagged and loaded into our CAFM system with its maintenance calendar and warranty dates.

    3. Day 18

      Team & stores mobilised

      Technicians, cleaners and guards inducted on your site. Critical spares stocked before we start.

    4. Day 30

      Go-live

      Helpdesk number on every floor, tenant app live, first PPM round under way.

    5. Every month

      KPI pack & review

      Response times, PPM completion, energy and every open ticket, in one report you can forward to the owner.

    Standards
    you can audit.

    • ISO 41001 facility management practice
    • ISO 9001 · ISO 14001 · ISO 45001
    • Civil Defence fire & life safety codes
    • Monthly KPI pack, open book

    Free site survey

    Let's walkyour building.

    Tell us what you manage. We'll visit, survey the plant and send a fixed monthly proposal within five working days.

    Helpdesk 24/7
    +974 4000 0000
    Office
    West Bay, Doha, Qatar
    Services needed

    Opens WhatsApp with your details filled in.